It that point coords have starting to use some lines in z2pnt with Hold and Pvt in the pointlist and this do my before working mail tracker rntrack not like and makes my nodelist tracker database to not work. Can a Point in a pointlist be down and hold + pvt - I will mean that a point in it sef is a pvt node or pvt point as he not is a node.